NEWS

03.12.2024 / News

Ongoing works at the RBS Tunnel Project in Bern


A KERN Tunneltechnik's Tunnel Formwork is once again in action, this time contributing to the development of the RBS...read more

25.10.2024 / News

Successful Milestone Reached at Gubrist


Successful Milestone Reached at Gubrist On October 18, 2024, a significant milestone was achieved in the Gu...read more

11.10.2024 / News

KERN Tunneltechnik Win Product Innovation of the Year at the BCI Awards


We are thrilled to announce that Align JV and KERN Tunneltechnik have been recognized with the prestigious Prod...read more

19.09.2024 / News

2TDK Project - Start of the Works


KERN Tunneltechnik, through its subsidiary KTS KERN, is proud to be a key partner in the ongoing Divaca-Koper Railway pr...read more

20.08.2024 / News

HS2 - Northolt Tunnel East - Cross Passage Formworks FAT


Last week, the HS2 - Northolt Tunnel East project reached a significant milestone with the successful completion of the ...read more

29.07.2024 / News

Special Gantries


At KERN Tunneltechnik, we are specialized in developing advanced special gantries designed to meet the unique demands of...read more

28.05.2024 / News

Gubrist Tunnel - Welk Precast Completion


The successful completion of pouring the last pre-cast culvert element for the first Gubrist Tunnel was achieved, markin...read more

11.03.2024 / News

Special Service Dismantling Gantry - FAT


Successful completion of the Factory Acceptance Test (FAT) for the HS2 Service Dismantling Gantry at our KTS facili...read more

19.02.2024 / News

HS2 - West Ruislip Crosspassage Lining


A significat milestone has been achieved by our client SCS in the HS2 project. The first crosspassage secondary li...read more

29.12.2023 / News

2023 Highlights


As we approach the end of 2023, let's take a moment to highlight the remarkable projects and advancements that have ...read more

21.12.2023 / News

Gubrist Tunnel - Installation completed


We are thrilled to announce a major milestone in the Gubrist Tunnel project as we proudly complete the installation and ...read more

11.12.2023 / News

HRBT Egress Formworks - First FAT


Last week we successfully completed at KTS KERN the factory acceptance test of the first Egress Tunnel Formwork machines...read more

27.10.2023 / News

Introducing the MSG - Multi Service Gantry


We are thrilled to unveil our latest product! Designed to meet the demanding requirements of complex projec...read more

24.10.2023 / News

Brail Tunnel - Special Material


Today from KTS KERN we are sending a special transport for special material designed and produced for the Brail Tunnel....read more

11.10.2023 / News

STUVA-Expo 2023


We are glad to announce that we will participate at the STUVA Expo 2023 on November 8th and 9th at Munich Trade Fair Cen...read more

09.10.2023 / News

London Super Sewer Project - Secondary Lining Completion


The Abbey Mills Pumping Station site marks the start and the arrival of a long journey for Kern Tunneltechnik and the Se...read more

20.09.2023 / News

Gubrist Tunnel - Project Update


Yesterday, the Gubrist Tunnel project received a visit from KERN's Engineering team to conduct the final surv...read more

13.09.2023 / News

HS2 - West Ruislip - Crosspassage Formwork FAT


Last week marked a significant milestone for the HS2 - West Ruislip project as the Factory Acceptance T...read more

17.08.2023 / News

Gubrist Tunnel Logistic Bridge - Start of the Assembly


The on-site erection of KERN's brand-new Tunnel Logistic Bridge supplied for ARGE Gubri in Switzerland has started a...read more

07.07.2023 / News

Rail Bogie - First system eBoost powered


Introducing the eBOOST Rail Bogie: we are thrilled to unveil our latest development, representing a remarkable milestone...read more

26.05.2023 / News

Hinkley Point C - Last Pour


A great journey comes to an end! We are delighted to announce that the final pour for the Hinkley Point C p...read more

22.05.2023 / News

RETC 2023 - Boston - Visit us Booth 800


We are thrilled to announce our participation in the highly anticipated RETC 2023 (Rapid Excavation and Tunneling Confer...read more

04.04.2023 / News

Tunnel Pekel - Last block completed


On the 30th of March 2023, the last casting of Tunnel Pekel in Slovenia has been completed. The formwork performed...read more

02.04.2023 / News

Engelberg - Parament Formwork 2nd Stage begins


The second stage of the Bauphase in Engelberg started. ...read more

31.03.2023 / News

Discover the New Turntable Bogie


The brand new Turntable Bogie developed by KERN offers great flexibility of use in different applications and environmen...read more

03.03.2023 / News

Hinkley Point C - Intake 2 Tunnel Shutter being launched


This week another great milestone has been achieved at Hinley Point C. The crown formwork, has been lowered into t...read more

03.02.2023 / News

Gubrist Tunnel - Welk Factory


The precast factory designed and produced for Gubrist Tunnel Werkanal segments, has been successefully installed and the...read more

02.02.2023 / News

Bern RBS LOS 2.4 - Project Update


As part of the major extension and development of the Bern main railway station, we delivered for a client a crown and k...read more

10.01.2023 / News

2022 Highlights


2022 is almost over! Let's have a look back at the highlights of outstanding projects and developments. A big ...read more

30.11.2022 / News

Tideway West - Secondary Lining Completion


A great milestone was achieved last week. The Secondary Lining team working on the 7km west section of the ...read more

18.11.2022 / News

Tunnel Alberberg - Project Update


We would like to share an update from our project Tunnel Alberberg in Germany. KERN has supplied the complete set ...read more

07.11.2022 / News

Temporary Factories for the Infrastructure Industry


We are proud to announce that KERN Tunneltechnik is able to suppy Temporary Factories for the Construction & Infrast...read more

30.10.2022 / News

Kappeschalung - Last Block


We are glad to announce that in October 2022 the casting of the largest block in the enlargement section of the Visperta...read more

28.10.2022 / News

Tideway: Greenwich Connection Tunnel - Secondary Lining


The 4.5km long Greenwich Connection section of the Thames Tideway Tunnel from Greenwich Pumping Station towards Chambers...read more

23.08.2022 / News

World Tunnel Congress 2022 - Visit Us - Booth A-82


Visit us at the World Tunnel Congress held in Copenhagen, Denmark on 2 - 8 September 2022. We will share our latest tunn...read more

19.08.2022 / News

KERN & VMT Partnership Announcement


KERN & VMT Partnership Announcement Secondary Lining Positioning & Setting System ...read more

11.06.2022 / News

Thames Tideway East - GRECT Shutter System Final FAT


This week we have successfully completed the Factory Acceptance Test for the 6 Fullround Formwork Tunnel Shutters design...read more

30.05.2022 / News

Hinkley Point C - Adit Invert Formwork


The launch adit Invert Formwork has been successfully assembled and launched. The system has been designe...read more

14.04.2022 / News

Machinery Pre-Assembly in the UK


KERN Tunneltechnik started with the first pre-assembly in the UK. A complete temporary facility has been establish...read more

22.03.2022 / News

Visp - Crown - First Block completed


KERN Tunneltechnik SA is happy to announce that on the 17th of March the 1st block of the tunnel crown was succesfully c...read more

16.03.2022 / News

Kramertunnel - Kappenschalung - First Block completed


The first block of the Kappenschalung in Kramertunnel has been succesfully compelted. ...read more

11.03.2022 / News

Engelberg - Parament Formwork 1st Stage completed


It has been completed the first part of the works of the Parament Formwork designed and manufactured for the Engelberg p...read more

04.03.2022 / News

Thames Tideway East - GRECT Factory Inspection


This week we had the first factory inspecion at KTS KERN by the Thames Tideway Ea...read more

23.02.2022 / News

Hinkley Point C - Installation of the 2m Crown Formwork


Last week the Hinkley Point Site Team successfully completed the installation of the 2m Crown Formwork designed and prod...read more

03.12.2021 / News

NCE Tunnelling Festival 2021


KERN Tunneltechnik is looking forward to seeing see you at the New Civil Engineer Tunnelling Festival on Wednesday 8th D...read more

01.12.2021 / News

Engelberg - Progress update


We are happy to announce that on the 1st December 2021 the casting of first block in the renovated section of the Engelb...read more

22.11.2021 / News

STUVA EXPO 2021


KERN Tunneltechnik will exhibit at the STUVA EXPO 2021 on the 24th / 25th of November....read more

29.10.2021 / News

Main Tunnel B Shutter System - Launch & First Block Completed


Thames Tideway Tunnel Main Tunnel B Shutter System - Launch & First Block Completed The first sec...read more

02.09.2021 / News

Kramertunnel - Jobsite Installation


At Kramertunnel is going on a full jobsite installation process. KERN Tunneltechnik is supplying several tunnel fo...read more

30.08.2021 / News

Hinkley Point C - Crown Formwork shaft installation


The Crown Formwork, designed and manufactured for the Hinkley Point C project, has been installed in the OG1 tunnel thro...read more

28.07.2021 / News

Hinkley Point C - Launch of the Invert Formwork


It has been completed the launch of the first machine for the Hinkley Point C project. The project consists...read more

26.07.2021 / News

Tunnel des Evouettes - Factory Acceptance Test


The Formwork, designed and manufactured for the Tunnel des Evouettes, has been pre-assembled and inspected by the client...read more

22.06.2021 / News

Engelberg Project - First steel beams assembled


KERN is glad to announce that our Automated Manipulator, successfully performed the complex assembly, with a millimetre ...read more

18.06.2021 / News

Frogmore Connection Tunnel - Works completion


The Secondary Lining of the Frogmore Connection Tunnel has been successfully completed on the Thames Tideway Tunnel by t...read more

13.06.2021 / News

KTS KERN - New Website


KTS KERN's new website is online. Get in touch with our specialized fac...read more

08.06.2021 / News

BV Brandberg - First tunnel completed


The small formwork designed and manufactured for BV Brandberg completed the lining for the first rescue tunnel. ...read more

31.05.2021 / News

Engelberg Tunnel - Launch of the Automated Manipulator


The Automated Manipulator specifically designed for the Engelberg project was transported and launched in the tunnel....read more

20.04.2021 / News

First block of Brandberg rescue tunnel


On the 14th of April first block of Brandberg rescue tunnel was successfully casted. The design, engineering and manufac...read more

31.03.2021 / News

Thames Tideway Tunnel West - The secondary lining works have started!


The 7km long west section of the Thames Tideway Tunnel from Acton Storm Tanks site in West London towards Carnwath Road ...read more

20.03.2021 / News

K-ONE - Automated Casting System


K-ONE is the brand new and innovative automated concrete casting device. Designed to be installed...read more

09.03.2021 / News

Hydropower Tunnel Tumpen - Launch of the Tunnel Formwork


The fullround tunnel formwork designed for the Hydropower Tumpen project has been successully launched. The scope ...read more

22.02.2021 / News

Kuckuckslay - Halfway to completion


An important milestone has been achieved last week. Half of the Kuckuckslay tunnel has been successfully completed...read more

12.02.2021 / News

Tunnelling Backup Machines - The brand new KERN's system


The brand new KERN's system is ready. We develops Backup Tunnellin Machines able to meet the highe...read more

23.12.2020 / News

MNTLA Systems - Pre-assembly completed and start of the deliveries


The MTNLA Secondary Lining System, which includes 6 tunnel formworks and the logistic crossing, has been completely pre-...read more

21.12.2020 / News

Kuckuckslay Tunnel - First Block


With a concrete volume of 163 m/3, the first block at the ARGE Tunnel Kuckuslay has been successfully completed on ...read more

14.12.2020 / News

Barn Elms - Tunnel Formwork Commissioning


The fullround tunnel formwork, designed and manufactured by KERN Tunneltechnik for Barhale and the BAM Nuttall, Morgan S...read more

10.12.2020 / News

Kuckuckslay Tunnel - Installation completed


The Kuckuckslay secondary lining system has been completely installed. A complex work method statement as well as ...read more

07.11.2020 / News

Cannstatt Project - Work in Progress


After the successfull start-up of the works at tunnel Cannstatt in 2019, the lining constructioin is progressing in diff...read more

12.10.2020 / News

KERN Tunneltechnik shortlisted at the NCE Tunnelling Awards 2020


We are delighted to announce that KERN Tunneltechnik has been shortlisted for two awards at the NCE Tun...read more

21.09.2020 / News

KERN Process Simulation Overview 2019-2020


The overall Process Simulation overview for 2019-2020 is now online. ...read more

02.08.2020 / News

KERN Metaltechnic


KERN Metaltechnic - Steelworks and Design A brand...read more

28.07.2020 / News

Reicholzheim - Transport Carrier


The Reicholzheim transport carrier has been assembled in jobsite together with the provision for the reinforcement....read more

30.04.2020 / News

Albvorlandtunnel - Final Crown Casting


Last week we had an outstanding achievement. The final block of the crown section in the Albvorlandtunnel has been...read more

10.04.2020 / News

KERN LAB - Digitalization and Process Simulation


The construction industry is constantly evolving and demanding to comply with all the latest technology and innovations ...read more

08.04.2020 / News

KERN Tunneltechnik Performance


Despite the current worldwide difficult situation, KERN Tunneltechnik with its departments is keeping the production per...read more

27.02.2020 / News

Start-up of the Frogmore Secondary Lining System


After several months of planning and preparation, the Shutter Secondary Lining system designed for the Frogmore connecti...read more

30.01.2020 / News

Albvorlandtunnel Kaverne


First secondary lining blocks for the Albvorlandtunnel Kaverne. The formwork is a bespoke transformable system req...read more

16.12.2019 / News

Main Drive Fullround Formwork - Factory Acceptance Test


After nearly 12 months of design, engineering and manufacturing the first of the 6 main tunnel secondary lining shutters...read more

06.12.2019 / News

NCE Tunnelling Festival Winner


Great night yesterday at the NCE Tunnelling Festival! KERN Tunneltechnik has been awarded in the In...read more

21.11.2019 / News

Barn Elms Fullround Shutter


The Fullround Formwork for the Barn Elms connection tunnel has been successfully pre-assembled and delivered to jobsite....read more

23.10.2019 / News

STUVA EXPO 2019: KERN LAB Presentation 2020


KERN Tunneltechnik will exhibit at the STUVA EXPO 2019 on t...read more

22.10.2019 / News

Platform Tunnel Shutter Installation


The Platform Tunnel Shutter has been installed at Bank Station CU site. ...read more

21.10.2019 / News

Tunnel rehabilitation in Switzerland


Kern Tunneltechnik SA is providing service for Tunnel rehabilitation and repair in Switzerland. ...read more

25.09.2019 / News

NCE Tunnelling Awards 2019 - Finalist


Kern Tunneltechnik has been shortlisted for the NCE Tunnelling Festiv...read more

20.09.2019 / News

Completion of the works at the Hammersmith Connection Tunnel


The Fullround Shutter completed its work at the Hammersmith Connection Tunnel. ...read more

13.09.2019 / News

Albvorlandtunnel Reinforcement Gantry Commissioning


The Ablvorlandtunnel Reinforcement Gantry has been assembled and it's ready to work. The gantry is provided wi...read more

05.09.2019 / News

Frogmore Fullround System - Factory Acceptance and Test


The Frogmore Fullround System successfully passed the tests on the 3rd September. Frogmore Connection tunnel is pa...read more

11.06.2019 / News

Kern Tunneltechnik at the RETC 2019 in Chicago


Kern Tunneltechnik SA  will exhibit at the RETC 2019 Tunnelling Conference in Chicago from 16th to 19th of June....read more

29.05.2019 / News

Works commencing at Taubenloch


On the 29th of May the 12.5m long Shutter at Taubenloch started with the secondary lining works. The shutter ...read more

30.04.2019 / News

Successful start at Tunnel Cannstatt


On the 30th of April it was successfully performerd the first block at Tunnel Cannstatt. A concrete volume of...read more

08.04.2019 / News

Bauma 2019 - The Automated Formwork Filling System


Developed through the partnership between Kern Tunneltechnik...read more

09.03.2019 / News

Installation of the Hammersmith Fullround Shutter


On the 9th of March the Hydrostatic Fullround Shutter - designed and manufactured by Kern Tunneltechnik - has been insta...read more

26.02.2019 / News

Albvorlandtunnel Formwork ready to start


The NBS Albvorlandtunnel formwork has been assembled on site and it's ready to start with the secondary lining works...read more

21.02.2019 / News

Factory Acceptance Test of the Bank Station RT Shutter


On the 21st of February we had the successfull Factory Acceptance Test of the Running Tunnel Shutter designed and manufa...read more

28.01.2019 / News

Bank Station Moving Walway Works


After the successfull completion of the enlargment blocks TSS and TSN, the MW Shutter has been transformed to perform th...read more

09.11.2018 / News

Bank Station MW Shutter Factory Acceptance Test


This week it was carried out the Factory Acceptance Test of the first Tunnel Formwork for the Bank Station Capacity Upgr...read more

21.09.2018 / News

KERN Tunneltechnik Ltd at the BTS Conference 2018


Kern Tunneltechnik Ltd will exhibit at the BTS Conf...read more

20.09.2018 / News

Bözbergtunnel Hydrostatic Formwork ready to start


The Hydrostatic Formwork manufactured for ...read more

30.08.2018 / News

Oberau Tunnel Enlargement Formwork


The Oberau Tunnel Enlargement Formwork has been installed and staterd with the Secondary Lining Works. ...read more

16.07.2018 / News

New high-tech painting and sandblasting facility


In July 2018 the new painting facility was inaugurated, going to integrate the KTS production workshop based in Slo...read more

04.07.2018 / News

Verzweigungskaverne Visp Completion


Beginning of July 2018 was completed the Verzweigungskaverne section at the Visp project. The ...read more

11.06.2018 / News

Kern Tunneltechnik at the NAT Conference 2018 in Washington DC


Kern Tunneltechnik SA  will exhibit at the North American Tunnling...read more

25.04.2018 / News

Secondary Lining Start at Tunnel Bözberg


On the 24th of May 2018 it has been performed the first secondary lining block at tunnel Bözberg with the Form...read more

15.03.2018 / News

Work in progress in Oberau Tunnel


Construction works for Oberau Tunnel are progressing. A complete Secondary Lining train is installed and in...read more

09.02.2018 / News

Commencing of the works in Herrschaftbucktunnel


Mid of February 2018 the works in Herrschaftbucktunnel started with the casting of the tunnel inlet. To cre...read more

19.01.2018 / News

Kern Annual Report 2017


Kern Annual Report 2017 available for download. ...read more

05.12.2017 / News

Stuva Expo 2017


Kern Tunneltechnik SA in partnership with ...read more

08.11.2017 / News

Kern Tunneltechnik at the AFTES Congress in Paris


Kern Tunneltechnik SA in partnership with ...read more

16.09.2017 / News

Geomechanics Colloquium Salzburg 2017


Kern Tunneltechnik SA in partnership with ...read more

10.08.2017 / News

Work in progress Arge Tunnel Visp


The construction works in Visp are proceeding in line with the program. Before the closure...read more

07.08.2017 / News

ES3 Secondary Lining works completion


Beginning of August 2017 it has been successfully completed the Secondary lining in the escalator tunnel ES...read more

28.07.2017 / News

Start-up of the Karlsruhe project


Today Kern Tunneltechnik completed the assembly and the customer commissioning of the trumpet formwork for the enla...read more

18.07.2017 / News

The crucial role played by the concrete in the formwork design


The concrete type represents one of the principal factors to take into account for a formwork design. The mix design and...read more

06.06.2017 / News

Liverpool Street Station Escalator


ESCALATOR SECONDARY LINING AT LIVERPOOL STREET STATION In April 2017 it was completed the ...read more

06.06.2017 / News

COMPETENCE DAYS AT KERN


Between May 22 and 24, three competence days took place in our facilities at KTS in Slovenia. The occasion was the compl...read more

06.06.2017 / News

WORLD TUNNEL CONGRESS 2017


KERN Tunneltechnik at the WTC 2017 This year’s ITA-AITES ...read more

Privacy
By using this site, you accept the use of our cookies. We use cookies to provide you with a better experience and to improve the performance of your site.

Confirm