07.08.2017 /
Beginning of August 2017 it has been successfully completed the Secondary lining in the escalator tunnel ES3 in Liverpool Street with the use of the KERN TSK Shutter.
The tunnel has been divided in 9 blocks including a special final pour with a conical shape to create a transition on the top of the escalator between two different geometries.
Kern Tunneltechnik provided the tunnel shutter and the staff for the construction works.
The Escalator Shutter, composed by the TSK system.
Kern’s personnel carried out the concrete secondary lining without any issue and ensuring a smooth work and a great performance.
The machine will be disassembled and delivered back to our workshop. The flexible system allows the reuse of the Escalator Shutter in similar projects.
We would like to thank the team of BBMV JV for the great collaboration provided in more than one year of work together.