20.09.2018 /

Bözbergtunnel Hydrostatic Formwork ready to start

The Hydrostatic Formwork manufactured for Bözbergtunnel is assembled in jobsite and ready to start with the works.
The machine is also designed  to be modified and adapted to 4 different geometries.

Privacy
By using this site, you accept the use of our cookies. We use cookies to provide you with a better experience and to improve the performance of your site.

Confirm