09.03.2021 /
The fullround tunnel formwork designed for the Hydropower Tumpen project has been successully launched.
The scope of the works is the construction of a 900m water tunnel which will be performed by BeMo Tunnelling GmbH.
Privacy
By using this site, you accept the use of our cookies. We use cookies to provide you with a better experience and to improve the performance of your site.