03.12.2024 /

Ongoing works at the RBS Tunnel Project in Bern

A KERN Tunneltechnik's Tunnel Formwork is once again in action, this time contributing to the development of the RBS (Regionalverkehr Bern-Solothurn) tunnel in Bern, Switzerland. The 10-meter-long formwork has been developed for our client Frutiger AG.

Since the handover, the formwork system has been operating at full speed, successfully producing multiple tunnel blocks. We extend our gratitude to our client for their collaboration in this significant infrastructure project.




Privacy
We use cookies to improve your browsing experience, analyze traffic, and optimize site performance.
You can accept all cookies, reject non-essential ones, or manage your preferences at any time.
Essential cookies are always active, while analytics and marketing cookies are used only with your consent.
All data is processed in accordance with the EU General Data Protection Regulation (GDPR).

Confirm
Reject