Location: Stuttgart - Germany
Customer: ATC S21
Working years: 2019 / 2020
Project information: Tunnel (single- and double-track) incl. branch-off structure, connection structure with lengths > 100 m (total length approx. 630 m), 1 smoke extraction structure, emergency gallery with connecting gallery, branch-off structure and crossing structure, emergency access and two intermediate headings, underpassing existing buildings and bridges
Total length: approx. 7,950 m
Supplied equipments: Supply of No.2 Formworks provided with the Putzmeister Formkret Automated Concrete filling system.
Additional Services:
Machine installation , Machine Removal ,
Privacy
By using this site, you accept the use of our cookies. We use cookies to provide you with a better experience and to improve the performance of your site.