Array ( [0] => 1 [1] => 4 [2] => 7 )

MNTLB - Connection Tunnel

Location: UK
Customer: BMB JV
Working years: 2021 - 2022
Project information:
Supplied equipments: The 150m long MNTLB connection tunnel delivered by the Tideway West section JV was part of the big sewage scheme connecting West and Central.

KERN Tunneltechnik has engineered and supplied a Formwork Shutter system able to work around tight curves as well as with different primary linings, segments and shotcrete.

The system has been completely pre-assembled and tested in our workshop at KTS.

Additional Services: Machine installation , Machine Removal , Supervision ,

Privacy
By using this site, you accept the use of our cookies. We use cookies to provide you with a better experience and to improve the performance of your site.

Confirm